Updated RTF Trailer

As people are just now breaking through and running the entire Rubicon Trail, some of us are still just getting our Jeeps out of hibernation.

At a recent club meeting, talk turned to the RTF trailer. We all loved that it was available for trail maintenance, but we didn’t like, or use the air of hydraulic system. Most of the time we hand pumped the trailer to dump.

I did a write-up on it years ago when it first came to the Tahoe side…

https://theotherrubicon.com/2014/02/22/new-rtf-trailer-for-the-tahoe-side/

One of my buddies asked about converting it to electric over hydraulic. I wasn’t opposed to it but it wasn’t mine to make the decision. So, I reached out to ERTF to ask if we could convert it. With RTF off the hook for costs, they said go for it.

Thanks go out to Tim with the Hills Angels 4wd Club of Reno Nevada. Tim did all the fab work on the trailer. Between he and the club they covered the construction costs. For now, I’m on the hook for the cost of the parts.

Superior Hydraulics in Sparks, NV really stepped up and worked with Tim to get the hoses and fittings dialed in: www.superiorhydraulic.net/

So here are the guts. The original hydraulic cylinder was swapped out for something that would work with for us. In hind sight, the original cylinder might be able to be converted to use with the new system. Battery, electric hydraulic pump and reservoir.

A battery was added to run the electric pump. It is charged off the 7-pin connector. If you don’t have a charge on the battery, it will still do a dozen or more dumps before running low. The manual handle is no longer usable. I’m going to add a Battery Tender connection to be able to keep it charged while not in use, or just before it goes out for a day of use.

Protection is always important. Tim had some old (new old stock) Toyota skid plates around and they worked great.

Tim even went so far as to weld rings to protect the mounting bolts.

Tim has always been bothered by the noise of these trailers as they go down the trail. So, he added some rubber padding along the frame rails and a rubber bushing to hold down the bed brace rod so it won’t make noise.

We’re working on getting the official list of parts together, so if RTF wants to convert the other trailers, they have a head start. There are things we’d change if other trailers are converted but overall, we’re happy. The cost should be under $400, maybe even down to $300 if we can reuse the original cylinder.

When it’s all said and done, the trailer is faster, easier and safer to use.

It’s almost as fast fully loaded, but I’m having trouble uploading that video.

Rubicon Ronin – 6/18/19


Get your ham license

Ham radio use has come a long way on the Rubicon over the last decade.

The Rubicon Trail Foundation, driven by Dennis Mayer, has made sure there is a year-round repeater system in the Rubicon valley. This allows any Rubicon Trail user to use a ham radio to reach out to Sacramento and the Tahoe area with a handheld radio.

This system has literally saved lives since it’s installation.

Do you have your ham license? Do you want to get it?

July 19-21, at the Boomtown Casino in Nevada, the Nevada State Amateur Radio Convention will be held. Website: NVCON.org

On Saturday, July 20th, you can do a one day ham cram. The class is from 8am-3:30pm with the test immediately following. This is the quickest way to get your license.

Also at the convention are vendors, forums and a ham swap meet.

If you have the time, check it out.


Breaking Sparks’ Code

I’ve probably mentioned it before but the City of Sparks has a code in place that makes it illegal to work on your own car on your own property.

You can change fluids and brake components but not swap carburetors, engines or axles.

Well, I needed to break the rules…

You see, I locked up the rear diff three months ago and the Jeep’s been parked in front of my house that whole time. My neighbors love me so it didn’t get ticketed.

Rather than just doing the diff work, I decided to swap springs and axle all together.

In less than three hours, I had the old axle/spring combo out and the in unit installed. Okay, it doesn’t have brakes and the spring perches are not welded to the axles. But everything was tight enough for me to back it in to the driveway.

Keep Jeepin’

.

Rubicon Ronin


New map addition for flier

The 2018 Rubicon Area OHV Trails map/flier is hot off the press.

Hopefully, by Saturday afternoon, I’ll get them at the Rubicon trailhead in Tahoma. Once the Middle Fork Trail opens, I’ll post them there as well. The LTBMU is on board and even the TNF has allowed me to put up my map and fliers at the Barker Pass intersection.

So, not a lot of changes but one very important change. I’ve added a better representation of the Rubicon Trail Foundation (RTF) property and the trail to access the property. If you remember, there was a land swap done to allow vehicle access to the RTF property from the Rubicon. So, the RTF property is no longer the traditional rectangle of a half section of land.

Flier map 2018_3_16 (Medium)

Please remember that the RTF property is private property. It must be open for you to drive there. The plan is for the property to be open every weekend this summer but not mid-week.

The trail on the map is an approximation. It should not be used for navigation but rather for the general location of the trail. Please stay on the trail and Tread Lightly!

RTF plans to build a caretaker cabin on the property this summer. That will allow the property to be open all summer in 2019.

For more information on the RTF property, I suggest visiting the RTF website:

www.RubiconTrailFoundation.com

If you have suggestions for future versions of this map or the flier please contact me:

TheOtherRubicon@charter.net

 

Rubicon Ronin

 

 

 


2018 FOTR Meeting

The annual FOTR meeting took place this morning at the Metal Cloak facility in Sacramento.

There was a good turn out; a couple of speakers; elections; food; etc.

Important to the Tahoe Side, Eldorado County is looking to get in to a memorandum of Understanding with Placer County to mange the Placer County portion of the trail. Vickie Sanders, with Eldorado County Parks, has always been there for the Rubicon Trail. She has now formally stepped up to help manage the Placer side.

Let’s hope that goes through.

The agreement would allow Vickie to write a single grant that would cover the entire trail. The debate of why can they do that on their side and we can’t argument would be gone as the trail would be managed by one agency. FYI, the LTBMU is onboard with the new management possibility.

The Rubicon Trail Foundation is looking for a caretaker to manage their property this coming season. I believe I heard it will only be open on weekends June through Sept. This season might bring two cabins on the property which would allow a caretaker to stay throughout the week and keep the property open seven days a week. The property swap agreement to allow a road to the property requires a caretaker in order for the property to be open to the public.

Tahoe side to do were discussed. Priorities are going to be set and volunteers will be needed. Please contact the newly re-elected Trail Boss, Shannon Chard at LaughingPlace76@yahoo.com if you would like to volunteer to work on the trail.

If you did work on the Rubicon within Placer County last year, please document your hours and get them to Shannon or Kansas with Placer County. If you do work this coming season, again, get your hours to Shannon or Placer County. Your volunteer hours count as cash for matching funds the counties need to come up with in order to get grant money.

Work on Cadillac Hill has already been scheduled at the lower Hairpin. Jeepers Jamboree is leading that project.

John Briggs has stepped down from the Tahoe Side Lead position after three years of service. FOTR is looking for someone to take over this position. John and others will be helping out who ever takes on that position.

 