Rubicon Trail CLOSED for PAVING!

Okay, I did that on purpose. They are only paving the Tahoma staging area and extending the access road.

June 21st through June 25th, the Rubicon Trail will be closed, at the Tahoe entrance. There will be reroutes available through Blackwood Canyon. See map below. Please plan accordingly.

Please do not try and sneak in the morning of the 21st or the evening of the 25th, wait until Saturday morning.

Coming out of the Rubicon, the easy reroute is Forest Road 03-04 over to Barker Pass and then down the paved Forest Road 03 to the lake. The more fun reroute is the Hobbit Trail (16E76) to Red Cabin (16E79) to Barker Pass and then down the Middle Fork Trail (15N38) to the lake.

This has been planned for many years now and is actually going to happen. The reasoning is to eliminate erosion and thus improve water quality (Keep Tahoe Blue) and to reduce dust in the basin. The reason for the solid closure is for the safety of the crew working and to speed up the process by not having to deal with outside vehicles.

Grant funding for this was obtained probably six years ago but by the time the actual plan to do it was in place the cost of paving was above the amount of the original grant and the project got put on hold.

It is my understanding that El Dorado County, namely Vickie Sanders, stepped in to help out with covering the extra cost through other grants. Thank you, Vickie. Here is a link to the El Dorado County press release:

https://edcgov.us/Government/Parks

The road in will be extended to the first rolling dip, about equal to furthest western edge of the staging area. That will eliminate that annoying dip right at the edge of the pavement. Hopefully, they will harden the first few feet of the dirt trail to prevent a similar development. That should be right about to the point I stood to take this picture. I do sometimes miss my old XJ, pictured.

The trees were removed last year and were available for firewood at the ATV rental parking area. I grabbed quite a few rounds. It will sort of be sad to burn them. There were still logs to be cut at the old ATV parking turn out. Bring a LONG saw as they are thick.

The new kiosk was built last year, the old one was removed and will be reused at another OHV trailhead. The paving should run right up to the concrete base of the kiosk.

There is a new 4’x8′ map posted on the kiosk. It’s a rough draft to check size and material. See below:

To start with, there will be no parking lines painted on the asphalt. The idea is to, one, save money by not painting, and two, allow the users to figure out how to property an efficiently park in the space allowed.

Some of the pot holes and the hard edges of the paved road in from the residential area will be also be addressed.

Here is a copy of the front page of the five page outline for the project. My chicken scratch notes as well.

Please be patient with this temporary closure. It will bring a much better staging area experience for both those going onto the trail and those coming off the trail.

.

Rubicon Ronin