Winch installation

So, it’s been a long time coming but the winch is finally mounted.

So this is the ‘project’ Jeep. I thought a simple project like getting the winch mounted would be quick and easy and a good motivator for the next step, replacing the leaking freeze plug.

It’s a Warn HS9500i. I got a screaming deal. Sneavy’s Off-Road was the source for the winch line. It’s mounted on a Warn winch plate with a modification. I’ll need to get out and re-wind the winch under a load to get it tight.

Winch 2

With it being a high speed winch, and looking to double the capacity of the pull, I often use a snatch block. On the current trail rig, there is a standard hook that I connect back to on the winch.

On this install, I decided to upgrade to a D-ring. I had to cut down the face of the winch plate for better access to the D-ring. I cut a 1/2″ plate to size and bought a D-ring mounting point online.

I outsourced the welding because although I can weld (sort-of), I didn’t want to have second thoughts every time I used the D-ring.

Winch

This project took WAY too long, but don’t they all. Although it looks like a stock bumper, It’s actually a 1/4″ plate bent to look stock. I cut down the bumper to 46″, that’s like 4″ off each side of a stock bumper. Then I had it powder pointed.

For those looking REALLY close at the details, yes, I still need to snug up the frame bolts.

Not sure where the front license plate will mount, if it gets mounted. Maybe just a magnet mount somewhere for to and from the trail.

Now to move on to that freeze plug.

 

Rubicon Ronin

 


Rubicon Oversight Committee

If you don’t know the name, maybe you’ll recognize them as the R.O.C.

They want your input! And they’re coming to you to get it. Keep reading.

The ROC is El Dorado County’s effort to bring people together to better manage the Rubicon Trail. Vickie Sanders runs the show. She’s been making things happen on the Rubicon since the early days of FOTR. No one has done more for the Rubicon Trail than Vickie Sanders, no one.

The ROC meets every third Thursday of the month at the El Dorado County offices off Forni Road in Placerville at 8:30am. It’s great for those in the area of the western entrance to the Rubicon but not so convenient for the rest of us in Truckee, Tahoe City, Reno, Carson, Auburn, ETC.

Well that’s about to change. El Dorado County is taking the ROC meetings on the road.

From Vickie:

We will be holding several meetings of the Rubicon Oversight Committee at various locations in an effort to get the education and coordination message out to a broader group of interested parties.  Please pass this information along.  Let me know if you have any questions.

Thank you,
Vickie Sanders
Parks Manager
County of El Dorado
Chief Administrative Office
530-621-7538
FAX: 530-642-0301
The attachment she sent:

WE ARE TAKING THE ROC ON THE ROAD

Rubicon Oversight Committee (ROC)

PURPOSE:

  • To educate a larger group of users on the educational program for the Rubicon Trail
  • To discuss maintenance efforts and how we work on the El Dorado side of the trail
  • To help facilitate maintenance activities in Placer County
  • To get more clubs, groups and individuals involved
  • To provide a holistic approach to the Rubicon

 

AGENCIES THAT WILL BE AVAILABLE:

  • Tahoe National Forest
  • Lake Tahoe Basin Management Unit
  • Eldorado National Forest
  • State Parks OHV Division
  • Placer County Sheriff’s Office
  • El Dorado County Parks Division

 

MEETING DATES, LOCATIONS AND TIMES:

May 30, 2018 –            6:30 p.m.

North Tahoe Event Center

8318 North Lake Blvd.

Kings Beach, CA 96143

 

June 4, 2018 – 6:30 p.m.

Murphy House at the Auburn State Recreation Area

501 El Dorado Street

Auburn, CA 95603

(El Dorado Street is HWY 193/49 as you head out of Auburn south towards the river crossing)

 

June 27, 2018 – 6:30 p.m.

(Tentative Location)

California Conservation Center

1949 Apache Ave

South Lake Tahoe, CA 96150

 

This is most likely due to the rumors that El Dorado County is looking to sign an MOU (Memorandum of Understanding) that would allow El Dorado County to manage the Placer County portion of the Rubicon Trail.

For the most part, this would be a very good thing. Vickie and El Dorado County has done wonders to mange, maintain and honestly, to keep the trail from being closed.

Placer County has been reluctant to step up their game and put more effort in to managing the Rubicon Trail. Placer has done things for the trail over the years but more needs to be done. El Dorado has demonstrated the willingness and ability to do just that.

My concerns are the actually being addressed by this mobile meeting plan. Over the years, the ROC has made many major decisions regarding the Rubicon Trail. If you weren’t in the room that day, you didn’t get a say in the decision. I drove to ROC meetings in Placerville, from Sparks NV, many, many times, as the Placer side user representative. It’s a 2.5 hour drive each way for a two hour meeting. It got old.

Once I stopped attending the meetings, I felt out of the loop. There were no efforts to continue to reach out to people not in the room. Even being on the email list for “all” things ROC, they didn’t reach out. The ROC made decisions that effected the Tahoe side of the trail and yet they didn’t reach out for input prior to the decision and implementation.

I am encouraged by this effort to reach out to the “other” side.

Let’s let Vickie, El Dorado County and Placer County know that the Tahoe side users care about the trail and we are willing to work with anyone and everyone that wants to better manage the Rubicon Trail.

 

Doug Barr

 


2018 FOTR Meeting

The annual FOTR meeting took place this morning at the Metal Cloak facility in Sacramento.

There was a good turn out; a couple of speakers; elections; food; etc.

Important to the Tahoe Side, Eldorado County is looking to get in to a memorandum of Understanding with Placer County to mange the Placer County portion of the trail. Vickie Sanders, with Eldorado County Parks, has always been there for the Rubicon Trail. She has now formally stepped up to help manage the Placer side.

Let’s hope that goes through.

The agreement would allow Vickie to write a single grant that would cover the entire trail. The debate of why can they do that on their side and we can’t argument would be gone as the trail would be managed by one agency. FYI, the LTBMU is onboard with the new management possibility.

The Rubicon Trail Foundation is looking for a caretaker to manage their property this coming season. I believe I heard it will only be open on weekends June through Sept. This season might bring two cabins on the property which would allow a caretaker to stay throughout the week and keep the property open seven days a week. The property swap agreement to allow a road to the property requires a caretaker in order for the property to be open to the public.

Tahoe side to do were discussed. Priorities are going to be set and volunteers will be needed. Please contact the newly re-elected Trail Boss, Shannon Chard at LaughingPlace76@yahoo.com if you would like to volunteer to work on the trail.

If you did work on the Rubicon within Placer County last year, please document your hours and get them to Shannon or Kansas with Placer County. If you do work this coming season, again, get your hours to Shannon or Placer County. Your volunteer hours count as cash for matching funds the counties need to come up with in order to get grant money.

Work on Cadillac Hill has already been scheduled at the lower Hairpin. Jeepers Jamboree is leading that project.

John Briggs has stepped down from the Tahoe Side Lead position after three years of service. FOTR is looking for someone to take over this position. John and others will be helping out who ever takes on that position.

 

Rubicon Ronin


Storm coming in!

Just an update on current conditions on the Tahoe side. 4-5-2018.

The pile of snow, curtesy of Placer County snow removal, has been over come on the right side.  There not much of a climb.

20180404_140433_resized_1

Just over the berm there is a two-track heading up the trail.

20180404_140448_resized_1

There is a very wet storm headed in tomorrow, Friday, and hanging around through Saturday. Snow will melt away and what’s left will be very heavy. Great for wheeling, in the morning, but beware in the afternoon as it melts and gets very slippery.

Be safe!

 

Rubicon Ronin

 

 

 


Chinese/Japanese Rig Solid Axle Swap

I’m going to write this generically as I don’t want to bias anyone against any specific brand of rig based on my bad experiences.

Like most people, I started with what I could afford. Unfortunately, that got me a rig with an independent front suspension.

 After some quality time off road, I realized some of the downfalls of an independent front suspension: ground clearance under flex, uneven tire wear, steering alignment, strength, complicated and thus expensive repairs, etc.

So, I finally decided to make the swap. I was going to pull out all the independent stuff and replace it with a solid axle.

Sourcing the solid axle was pretty simple. Pulling out the independent suspension was flat out going to be fun! The hard part was going to engineer the new solid axle into a rig not designed for it.

A before picture clearly showing uneven tire wear and the difficulty of keeping the steering aligned.

DSC00770

DSC00765

DSC00766

Off I went, out with the old, in with the new. I started by getting the rig up on jack stands for safety and all the old independent suspension parts were unceremoniously removed.

DSC00767

Here are the old parts next to the new solid axle that will be going in. I’m going to try and use as much of the old steering parts as possible.

DSC00768

The new solid axle doesn’t look much different from the side. But do note that I was able to use the old adjustable ride height system from the previous system.

DSC00769

But from the top you can already see the better alignment of the tires.

DSC00771

Underneath, where all the magic happened. It clearly shows the new solid axle and how much stronger it will be than the old independent system.

DSC00772

Here is an after shot after quite a bit of time getting everything just right. Measure twice, cut once. Back on all fours and ready for some off road travels.

DSC00773

 

 

 

So far the rig is night and day different. I goes straight with hands off the controls, it doesn’t pull at all when you initiate a turn. Once I get new tires for it, I expect the tires to wear evenly and last much longer.

After all was said and done, I would highly recommend this swap for anyone with an independent front suspension.

 

DSC00764

 

Rubicon Ronin