Broken axle means time to upgrade!
Posted: May 29, 2022 Filed under: Travel | Tags: broken, cadillac, repair Leave a commentHere’s a story of the details of what happened on the run to check the Long Lake Trail last week.
On the way out, I heard a strange sound coming from the front driver’s side tire. Before attempting the lower hairpin on Cadillac Hill, I stopped to check it out.
It was pretty easy to find where the noise was coming from. This was taken at the staging area. When I first checked it, there was no scrapes on the yoke. It appears that the ears of the outer shaft broke first, as the u-joint is undamaged but missing both caps.

We figured it was easiest to just leave it as it was and just drive out. Luckily, with a Rubicon model TJ, I still had three-wheel drive with both lockers engaged.
As the broken ‘ears’ were slowly bent out, contact was made with the knuckle. Fortunately, the axles I was going to put in required just such an extra clearance.

Enter RCV axles! If you’re going to upgrade, go all the way.

The driver’s side inner axle had been ‘hammered’ into the axle housing. It took a few hits with a big hammer to free the axle. The proper move might have been to remove the outer shaft as soon as possible.

A 4 1/2″ angle grinder was used to clearance the knuckle for the boot of the new axle. They were then cleaned and painted.

The new axles in place. Very distinguishable with the bright orange boot. This is a fully seated boot on. Easier said than done.

The manufacturer provided a sleeve to hold the boot as you slide the axle through it. But seating it properly was a pain; theirs is on the left side below with the hood. That was for before you installed the brake shield and unit bearing.
I built the one on the right to use after the unit bearing had been installed.

With a pair of pry bars, I was able to fully seat the boot. Or so I thought. I actually had to use the manufacturer’s piece and mine together to fully seat the boot. I’ll be making a thicker unit to carry with me in case I need to reseat the boot on the trail.

If you’re doing an RCV axle installation, make sure the boot is on far enough to see the edge of the boot seat surface.

As if a broken ear on the trail at the base of Cadillac Hill wasn’t enough, when I took apart the passenger’s side, I discovered that I had thrown a u-joint cap but the joint hadn’t come apart yet.

My axle was not the only issue. A fellow traveler lost all of his power steering fluid due to a fitting coming loose. That was an easy fix: tighten and refill. Between the six rigs we had what we needed.
I will admit that I had not loaded all of my trail boxes for this trip. I loaded more for clearing trees from the Long Lake Trail and possibly spending the night than I did for repairing a broken rig. The lesson is to bring everything you can on every trip.
.
Rubicon Ronin
Helicopters beat trailers
Posted: September 20, 2020 Filed under: Maintenance | Tags: cadillac, maintenance, rock Leave a commentHere is a link to an upcoming article about using helicopters to transport rock and heavy equipment on the Rubicon Trail.
This is the same company contracted to fly rock this October in to Cadillac Hill. Although it is quite expensive, it is less expensive, quicker and easier on our Jeeps that using small Jeep trailers.

.
Rubicon Ronin
Cadillac Hill Maintenance
Posted: September 16, 2020 Filed under: Access, Maintenance, Travel | Tags: cadillac, El dorado, Jeepers Jamboree, JJ, maintenance, rock Leave a commentEl Dorado County has scheduled rock work for Cadillac Hill for October 17, 18 & 19. Expect extended delays and/or a possible temporary closure. I will try to post timeline details as the date gets closer.
This project was previously scheduled for Oct 3, 4 & 5 but was pushed back due to the helicopter company being needed to fight the CA wildfires.
Although the paperwork between El Dorado County and the Tahoe National Forest has not been completed, Jeepers Jamboree will work Cadillac Hill next month. El Dorado County will fly in the needed rock. JJ will put down cyclone fencing, fill it with rock and wrap-it to secure the rock in place and cover with more rock. Some concrete work will also be done as needed in various spots. Besides securing the trail from sliding off the hill, improving the drainage of water OFF the trail is also a goal.





Please avoid Cadillac Hill that weekend to allow this crew to work without interruption. It is in all of our best interest to stabilize Cadillac Hill so the trail is there after each winter.
.
Rubicon Ronin