Long Lake Trail Maintenance 7-28-21
Posted: July 28, 2021 Filed under: Access, Maintenance, Travel | Tags: 16E12, long lake, maintenance Leave a commentThe Long Lake Trail is at the bottom of Cadillac Hill and runs along the Rubicon River for 0.91 miles. Yes, I’m getting that specific as there is a definite end of the trail that we must adhere to or we could lose the entire trail.
The kiosk at the trailhead received some new paperwork as the old ones were wet and faded.

A few nuisance boulders were removed from the center of the trail. These were not obstacles that added anything to the trail experience, just something to go around and make the trail wider.

The campsite area had the old drive through route blocked off (again) and signed to explain why. The Forest Service has prohibited the area as a drive through. If we don’t play by the rules, we could lose the campsite.


This step got some reworking. There was an undercut developing which is nothing anyone wants to try and drive up. It only leads to breakage. And the boulder in the middle of nowhere is one of those nuisance boulders that was moved. This one was moved in to the undercut area and built in to a ramp.

Two routes were maintained. Easy towards the river (right side) and harder (but not tough) closer to the HUGE boulder.


The end of the trail has been blocked and signed to prevent travel and inform the users.

Please get out there and explore and enjoy your trails. The Long Lake Trail is adopt and maintained by the Lake Tahoe Hi-Lo’s.
.
Rubicon Ronin
Long Lake Trailhead Sign
Posted: June 29, 2020 Filed under: Access, Maintenance, Travel | Tags: Hi-Lo's, long lake, map, signage, TNF Leave a commentSeveral years ago, the Lake Tahoe Hi-Lo’s installed a trailhead sign at the entrance to the Long Lake Trail (16E12). It’s the left turn just before the graves on the Rubicon Trail.

Well, over those years the sign was a little neglected. That changed this past weekend at the Hi-Lo’s returned and installed new posts for the sign and updated the information on the sign.

It was truly a team effort. I provided the signage, Michael brought a power auger, Gary brought hand and power tools (and the trailer to haul all this stuff), Scot provided the cement, Carlos was do everything man of the day. Kade served as the finisher making sure everything was squared away at the end.

Hopefully, fewer people will take a wrong turn there as they head to Cadillac Hill and Lake Tahoe as probably six rigs did while we were there! I do want to add a small “Dead End” sign.

The post and sign are not going anywhere with the concrete, pipe and brackets used!

It needs paint and a piece of plexiglass but it looks great.
I personally want to thank everyone that had a hand in this project. It was really a team effort and with so many people stepping up, it didn’t take a whole lot of effort. The hard part was getting our act together before hitting the trail to make sure we had everything.
.
Rubicon Ronin